IKEA Logistic Centre
Dortmund

Reference 013

 
 
SuperDrain siphonic roof drainage

SuperDrain siphonic roof drainage

Project: IKEA logistic centre
Location: Dortmund, Germany
Year: 2008

 

The central IKEA warehouse in Dortmund supplies all European furniture stores. That requires perfect logistics and smooth operational processes – and that includes the roof drainage system. IKEA chose SuperDrain for its siphonic drainage. Systematic complete filling means that the pipes are already at capacity after light showers, forming a water column that falls down. The water is then removed from the surrounding roof surfaces by suction, using negative pressure. This system works with significantly fewer and smaller pipes which can be installed under the roof without gradient. Reducing the number of downpipes increases the utility of the building, and the high flow velocity ensures self-cleansing of the pipes.
(Photography: Press photographs, IKEA Germany)

Further References

Shape Copy 3 Created with Sketch.

Drainage by design.
Since 1913

 
 

Customer service
+ 49 2932 9616 - 0

Service times:
Monday to Thursday 7:15 - 17:00
Friday 7:15 - 14:00

Contact

Dallmer GmbH + Co. KG
Wiebelsheidestraße 25
59757 Arnsberg
Germany

T. + 49 2932 9616 - 0
F. + 49 2932 9616 - 222

info@dallmer.de

 
 
Shape Copy 3 Created with Sketch.

Contact

Dallmer GmbH + Co. KG
Wiebelsheidestraße 25
59757 Arnsberg
Germany

T. + 49 2932 9616 - 0
F. + 49 2932 9616 - 222

info@dallmer.de

 
Shape Copy 3 Created with Sketch.

Show address

Contact

Dallmer GmbH + Co. KG
Wiebelsheidestraße 25
59757 Arnsberg
Germany

T. + 49 2932 9616 - 0
F. + 49 2932 9616 - 222

info@dallmer.de



 
Download selected items
orderSelection